the high desert model home in process

form boards are set by the concrete contractor prior to digging the footings. the picture is taken from the head of the stair leading down to the entry court through the trees.

the 2,500 gal domestic water tank installed on top of the hill above the pad. the trench is for the water supply line to the carpark where the water truck will stop to fill the tank.

this view is from the path leading from the future carpark. at the level section in the path we will install a 2,500 gal domestic water supply tank. at our site we will need to eventually drill a well about 300' deep. until then we will have to have our water hauled by truck.

from the pad down to the road, the spoils from the cut were spread out to create a temporary driveway for construction vehicles. once the building is finished, the road will be erased and access to the house will be from the carpark beyond the hill at the rear of the pad.

a good view of the cut in the hillside we made for the pad. notching the building into the hillside will help screen the building from the road and also help to minimize winter winds coming from the North (top of hill)

a view of the cut for the pad looking back towards the carpark and future water tank. the entry court is visible as an orange outline in the middle of the image
Subscribe to:
Posts (Atom)
Blog Archive
-
►
2008
(42)
-
►
April
(13)
- perfect weather has arrivedwe luxuriate in opening...
- even the bathroom is open to the fresh air
- Oleana loves our new curtains
- bath time
- spring flowers are blooming
- Summer plays hide and seek with Oleana
- the new bench has a nice hand-hewn quality that co...
- Olee's friend Summer sitting on the new bench
- almost done
- halfway there
- we salvaged a tree from another construction proje...
-
►
February
(7)
- the house now feels complete with the pattern and ...
- now that the patterns are applied, we turn our foc...
- a little sweeping up after some visitors. 30 peop...
- the front door with the finished pattern
- the far kitchen wall will also be covered in the p...
- the design as seen from the entry court. we want t...
- the first two Sarah Morris / Liam Gillick panels w...
-
►
January
(13)
- a beautiful three day rainstorm visits the high de...
- the house sits on 5 acres of high desert hillside ...
- new curtains for the house designed and fabricated...
- the guest bedroom curtains
- the master bedroom curtains are felt - sewn in nar...
- snow in the mountains just about 500 feet above us...
- on one hand, getting reading for an early morning ...
- the essential paradox of glass...
- putting the kids to work in the garden
- holiday supper in style
- living room, dining room, and kitchen fully furnis...
- our new couch finally arrived - there's nothing so...
- christmas lights on our courtyard oak
-
►
April
(13)
-
▼
2006
(57)
-
▼
August
(10)
- form boards are set by the concrete contractor pri...
- the 2,500 gal domestic water tank installed on top...
- this view is from the path leading from the future...
- from the pad down to the road, the spoils from the...
- a good view of the cut in the hillside we made for...
- linda standing in the future kitchen
- a view of the cut for the pad looking back towards...
- standing in the future fireplace courtyard. the t...
- May 31st
-
▼
August
(10)