iT house blog
the high desert model home in process
the 2,500 gal domestic water tank installed on top of the hill above the pad. the trench is for the water supply line to the carpark where the water truck will stop to fill the tank.
Newer Post
Older Post
Home
Blog Archive
►
2009
(1)
►
August
(1)
►
2008
(42)
►
December
(4)
►
August
(1)
►
April
(13)
►
March
(4)
►
February
(7)
►
January
(13)
►
2007
(66)
►
October
(6)
►
August
(4)
►
July
(4)
►
June
(11)
►
March
(14)
►
February
(19)
►
January
(8)
▼
2006
(57)
►
December
(9)
►
November
(9)
►
October
(20)
►
September
(4)
▼
August
(10)
No title
form boards are set by the concrete contractor pri...
the 2,500 gal domestic water tank installed on top...
this view is from the path leading from the future...
from the pad down to the road, the spoils from the...
a good view of the cut in the hillside we made for...
linda standing in the future kitchen
a view of the cut for the pad looking back towards...
standing in the future fireplace courtyard. the t...
May 31st
►
March
(4)
►
February
(1)
►
2005
(1)
►
December
(1)
About Me
Taalman Koch Architecture
View my complete profile