the high desert model home in process
the pieces are then screwed down to the aluminum
beams every 4" on center, and also attached together
along the lap joints at 3' on center. The entire 1,500
sf of roof took about 1,000 screws.
Newer Post
Older Post
Home
Blog Archive
►
2009
(1)
►
August
(1)
►
2008
(42)
►
December
(4)
►
August
(1)
►
April
(13)
►
March
(4)
►
February
(7)
►
January
(13)
►
2007
(66)
►
October
(6)
►
August
(4)
►
July
(4)
►
June
(11)
►
March
(14)
►
February
(19)
►
January
(8)
▼
2006
(57)
▼
December
(9)
linda visits the house with our 2 month old daught...
with the structrual frame and roof complete, wood ...
No title
with the roof decking complete, I returned to atta...
view of the house from the driveway entrance
with three friends it took 2 days to complete the ...
No title
the pieces are then screwed down to the aluminum b...
the structural roof is made of 20 gauge steel deck...
►
November
(9)
►
October
(20)
►
September
(4)
►
August
(10)
►
March
(4)
►
February
(1)
►
2005
(1)
►
December
(1)
About Me
Taalman Koch Architecture
View my complete profile