the high desert model home in process
.jpg)
the exterior envelope of the house is complete. now we focus
on interior details and the solar energy package
.jpg)
cladding is being installed this weekend. a small
mock-up of the plastic polygal sheathing is being
tested for appearance on the outdoor fireplace wall.
.jpg)
this view shows the master bedroom closet cabinets
in the foreground and the guest bedroom/bathroom
cabinets in the distance. glass storefront doors will
be installed between the rooms once the cabinets
are completed.
.jpg)
this view shows the back of the guest bedroom cabinets
and the plumbing chase in the bathroom. the plumbing
will be covered by an orange 3Form wainscotting piece
(which will also form a small shelf) above which will be
a mirror that continues to the ceiling and covers the
cabinets "wall to wall"

the flat pak cabinets are assembled in place and
connected together to create privacy "walls" between
the bedrooms and the bathroom
.jpg)
the entry court and kitchen. visible on the floor of
the kitchen are stacks of the flat pak cabinets for the
bedrooms.
.jpg)
this image shows the glass wall in front of the
living room. temporary metal clips are visible in
each silicone joint.
.jpg)
the glazing crew installs all the fixed panels.
they will be butt glazed which means that there
is no aluminum frame between panels -- only
a thin line of black silicone.
.jpg)
this picture shows the fixed glass sill at the slab
with the flashing piece and the aluminum angle
jamb which is co-fabbed onto our customized
sliding glass door jamb in the factory.
.jpg)
The fixed glass system track fits into our structural
aluminum system to make a better water and wind
barrier while also dictating to the installers precisely
where the glass wall is to be placed.
.jpg)
the glass installation begins! our glass storefront
manufacturing partner has prefabricated all the parts
of the glass enclosure system and delivered it to the
site. the local glazing company installs the parts in
rapid succession strictly on an hourly basis. the
installation time is relatively short because nearly
everything is pre-cut for easy placement. in this
picture the sliding glass door in front of the
bathroom is being installed.
Subscribe to:
Posts (Atom)
Blog Archive
-
►
2008
(42)
-
►
April
(13)
- perfect weather has arrivedwe luxuriate in opening...
- even the bathroom is open to the fresh air
- Oleana loves our new curtains
- bath time
- spring flowers are blooming
- Summer plays hide and seek with Oleana
- the new bench has a nice hand-hewn quality that co...
- Olee's friend Summer sitting on the new bench
- almost done
- halfway there
- we salvaged a tree from another construction proje...
-
►
February
(7)
- the house now feels complete with the pattern and ...
- now that the patterns are applied, we turn our foc...
- a little sweeping up after some visitors. 30 peop...
- the front door with the finished pattern
- the far kitchen wall will also be covered in the p...
- the design as seen from the entry court. we want t...
- the first two Sarah Morris / Liam Gillick panels w...
-
►
January
(13)
- a beautiful three day rainstorm visits the high de...
- the house sits on 5 acres of high desert hillside ...
- new curtains for the house designed and fabricated...
- the guest bedroom curtains
- the master bedroom curtains are felt - sewn in nar...
- snow in the mountains just about 500 feet above us...
- on one hand, getting reading for an early morning ...
- the essential paradox of glass...
- putting the kids to work in the garden
- holiday supper in style
- living room, dining room, and kitchen fully furnis...
- our new couch finally arrived - there's nothing so...
- christmas lights on our courtyard oak
-
►
April
(13)
-
▼
2007
(66)
-
▼
February
(19)
- the exterior envelope of the house is complete. no...
- white polygal cladding is attached to the mechanic...
- cladding is being installed this weekend. a small ...
- this view shows the master bedroom closet cabinets...
- this view shows the back of the guest bedroom cabi...
- the flat pak cabinets are assembled in place and c...
- the view through the entry court and living room
- the entry court and kitchen. visible on the floor ...
- the reflection and transparency create interesting...
- this image shows the glass wall in front of the li...
- the glazing crew installs the cap piece on the alu...
- the glazing crew installs all the fixed panels. th...
- this picture shows the fixed glass sill at the sla...
- The fixed glass system track fits into our structu...
- the glass installation begins! our glass storefron...
- The finished roof is a fiberglass mesh encapsulate...
-
▼
February
(19)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)