the high desert model home in process

September 2nd



We spent the nite in the bed of the pick up truck to awake at dawn.

During the week, the concrete sub will return to finish trenching and to install the rebar cages in the footings.


We inspected the footings dug by the concrete sub and measured the locations of the plumbing waste lines to double-check the plumber's interpretation of the drawings.


I brought (a pregnant) linda to the site to see the layout of the plan on the site.